职位详情
五险一金
年终奖金
带薪年假
定期体检
发展空间大
公司规模大
技能培训
管理规范
岗位要求:
1. 本科以上学历,机械、工业工程及相关专业优先
Bachelor’s degree or above, Mechanical, industry engineering or relative specialty priority
2. 2年以上SAP维护,熟悉作业成本,电子连接器行业优先
At least two-year working experience in SAP maintenance, familiar with manufacturing costs, electronic connector industry is better
3. 英语读写能力良好,能独立阅读英文图纸和资料
Good skill in English reading and writing. Comprehend the English drawing and specification independent.
4. 能熟练使用SAP软件和OFFICE软件
Good skills in application of SAP, office etc.
5. 具备良好的沟通协调能力和分析解决问题能力
Good communication and coordination ability and solving problem ability.
6. 具有较强责任感,注重团队协作
With strong sense of responsibility and teamwork
岗位职责:
1.根据产品报价单和图纸识别生产流程以及创建生产BOM和Routing
"Identify production process and set-up production BOM&Rouitng based on product quotation and product drawing.
(i) Check P-drawing and quotation, identify product raw material and set-up BOM
(ii) Based on P-drawing and plant machine capacity, evaluate suitable production process and set-up Routing.
(iii)Check the tool investment, calculate the tool cost of product, maintain the tool cost in Routing."
2.跟踪生产实际参数,根据实际参数更新BOM和Routing
Tracking actual production parameters, update BOM&Routing according to actual parameters.
3.分析产品成本,并提出成本降低的改善建议
"Analyze the product cost and identify cost reduction opportunities.
(i) Track the production actual material usage, analyze the actual usage and standard usage, drive workshop improvement based on analysis results.
(ii)Track the production actual parameters, analyze the actual runtime and standard runtime, drive workshop improvement based on analysis results."
4.分析工程变更生产流程的影响,更新BOM和Routing
"(i)Evaluate the impact of 4M to production processes.
(ii)Update production BOM&Rouing according to 4M"
4.生产过程的分析和工时的测量,通过分析和评估瓶颈工序,产线用工,提高产线平衡率,降低产品成本和提高工序产出。
Process analysis and Run time measurement.
(i)Conduct the onsite operating runtime measurement; consolidate the information into run time sheet; and analyze and evaluate the process bottlenecks, according to the run time sheet to minimize costs, increase yields and productivity.
(ii)Participate in the evaluation of new projects, including line capacity, run time, process bottlenecks, man-hours, to ensure the payback on new projects.
5.跟踪各车间的效率和OEE,分析数据,主导各车间效率和OEE的改善
"Identify other opportunities to improve workshop efficiency & OEE performance and lead Gemba kaizen.
(i) Monthly counter measures from each VS for the missed KPI’s.
(ii) Maintain the actual run time and routine’s accuracy and run the report.
(iii)Follow up the monthly report and lead to improvement create value.
其他信息
语言要求:英语、普通话
行业要求:全部行业